Procter & Gamble Link Bridge Refurbishment

Millcroft’s construction division have completed the refurbishment of the link bridge and staff breakout area at Procter and Gamble’s (London) facility in West Thurrock

The scope of works included replacement of the bridge's old crittall frames to UPVC double glazed windows. The roof was covered in a Sealoflex Ultima liquid roofing system and the underside external floor was insulated and clad in metal panelling. Internally a bespoke new lighting system had to be manufactured and installed on site, along with a new ceiling grid and flooring throughout.

All refurbishment work was carried out whilst the bridge was in constant use as it was a fire escape route for both buildings. The project was successfully completed on time and budget and was opened by Procter & Gamble's UK management team in December 2013.

  

Project Data

Client:

Procter & Gamble

Services:

Construction Services

Completion:

December 2013

UKASLondon Living WageNASCChasBuilding ConfidenceLink UpFORSUVDB